| Common Issue | Why It Matters | What Should Be Confirmed Before Finalizing the Project |
| Production Stages Are Not Capacity-Matched | A high-output filling line cannot improve total production if sterilization, incubation or fruiting becomes the bottleneck. | Confirm the capacity, operating cycle and working hours of each production stage, rather than evaluating individual machines separately. |
| Factory Information Is Incomplete | Equipment layout and installation planning may change if ceiling height, door dimensions, structural restrictions or available space are not confirmed early. | Provide factory drawings, dimensions, entrances, ceiling height, available production areas and site photos before layout planning. |
| Cultivation Container Specifications Change Late | Bag or bottle dimensions, filling weight and closure design can directly affect filling equipment, conveyors, sterilization loading and handling systems. | Confirm container dimensions, filling weight, material, cap/ring/filter specifications and expected production quantity before equipment configuration. |
| Local Utilities Cannot Support the Planned System | Insufficient steam, electricity, water, cooling or ventilation capacity can restrict equipment operation and growing-room performance. | Confirm available electricity, voltage, steam capacity, water supply, cooling, heating, compressed air and ventilation conditions. |
| Growing Room Capacity Is Underestimated | Production-line output may exceed the available incubation or fruiting capacity, causing production bottlenecks. | Calculate room quantity and shelf capacity according to daily production, incubation period, fruiting cycle and room turnover. |
| Local Installation Conditions Are Not Confirmed | Equipment may arrive before the site, utilities or local installation team are ready, delaying commissioning. | Confirm site readiness, unloading access, installation tools, local workers, utilities and installation responsibilities before shipment. |
| Project Responsibilities Are Unclear | Turnkey projects may involve Satrise, the customer and local contractors, and unclear responsibilities can cause delays or unexpected costs. | Confirm responsibility for civil works, utilities, permits, transportation, installation, commissioning and local labor before project execution. |
| Future Expansion Is Not Considered | A layout designed only for current capacity may make later expansion difficult or expensive. | Confirm whether future capacity expansion is planned and reserve sufficient space, utility capacity and equipment interfaces where appropriate. |